The Aqua Line 3 of the Mumbai Metro,[5] also known as Colaba-Bandra-Seepz Line, is a part of the metro system under construction in Mumbai, India.[6][7] When completed, the 33.5-km long line will be the first underground metro line in Mumbai and will be operated by MMRC.[8] The metro line will connect Cuffe Parade business district in the extreme south of the city to SEEPZ in the north-central[9] with 26 underground and one at-grade station.[10] The track width is standard gauge. The cost of this corridor is estimated at ₹30,000 crore (US$3.8 billion). Line 3 is expected to reduce road congestion, besides reducing the load on the Western Line between Bandra and Churchgate.[11][12]

The project is being implemented by the Mumbai Metro Rail Corporation Limited (MMRCL). The line starts at Cuffe Parade, will run through Nariman Point, Churchgate, CSMT, Girgaon, Worli, Dadar, Mahim, Bandra-Kurla Complex, Santacruz (East) and past the domestic and international terminals of Mumbai Airport, through Andheri MIDC and terminates at SEEPZ.[11][13] The 33.5 km, Rs. 23,136 crore project involves five major entities - MMRCL (Mumbai Metro Rail Corporation Limited), Padeco, MMRDA, CREC (China),.[14] Major (65%) funding for the project was received through a soft loan of Rs. 13,235 crore from JICA (Japan International Cooperation Agency) with the rest provided by the exchequer through the Government of India and Government of Maharashtra.[15][14][16]

The section of the line between Bandra Kurla Complex and Dharavi stations includes a 170 metre long twin-tunnel passing under the Mithi river. One of the tunnels was completed in March 2020.[17] This will be the second under-river metro rail tunnel in India after the tunnel underneath the Hooghly river on Kolkata Metro Line 2.[18]

The construction of this metro route faced hurdles from environmentalists and activists lodging numerous PILs over cutting of trees in various region accompanied with a larger protest in Aarey over the carshed construction. PILs were either dismissed or didn't succeed as both the Supreme Court and the Maharashtra High Court cited the importance of the metro project.[19][20]

An extension of the line has also been proposed to extend the line by 2.5 km to Navy Nagar from Cuffe Parade. As per the initial plan, Cuffe Parade was planned to be the first station of the line; however, after extension, the first station will be Navy Nagar. There are 26 stations planned earlier, which will be 27 stations on the line after the extension. The extension on metro line 3 will cost an additional ₹2,301 crore.[21][22]


Comments ()


Sign in

Read Next

Traveling

Blog banner

bulk email software

Blog banner

Power of words

Blog banner

Deadlock in Operating System

Blog banner

MUTUAL EXCLUSION

Blog banner

How to Avoid being a Victim of Cybercrime

Blog banner

Service Transition Process in ITSM

Blog banner

CONCURRENCY: MUTUAL EXCLUSION AND SYNCHRONIZATION-het karia

Blog banner

LiquidPlanner

Blog banner

Tiranga - Abbas Haveliwala

Blog banner

A Happier Workplace Starts with Healthy Lunches by Meal Maharaj

Blog banner

Threads

Blog banner

Session Vulnerabilities

Blog banner

Time Series Analysis

Blog banner

Memory Management in Operating System

Blog banner

NIKE

Blog banner

Child labour

Blog banner

CyberSecurity Color Wheel

Blog banner

TRIGGERS IN DATABASE

Blog banner

Cycling

Blog banner

Importance of internet

Blog banner

Building a Better You: Fitness Tips and Inspiration.

Blog banner

Mail merge

Blog banner

PERSONALITY DEVELOPMENT

Blog banner

SPAM

Blog banner

Eating Well With Meal Maharaj on Busy Workdays Without Cooking

Blog banner

Are Social Media Paid Campaigns Worth It?

Blog banner

Linux Virtual Machine Process Scheduling

Blog banner

Understanding E-mail Servers

Blog banner

Process, process creation and process termination

Blog banner

OS- Assignnment 1

Blog banner

Virtual Machine

Blog banner

AutoML: The Future of Automated Data Science

Blog banner

Different types of scam frauds

Blog banner

E-mail security

Blog banner

Consumer to consumer business mode

Blog banner

THE DESIRE OF MANY

Blog banner

Question

Blog banner

Man VS Nature

Blog banner

Volatile Memory & Non-Volatile Memory Explained

Blog banner

The launch of UniMap by HERE

Blog banner

Email Privacy

Blog banner