wisemonkeys logo
FeedNotificationProfileManage Forms
FeedNotificationSearchSign in
wisemonkeys logo

Blogs

Mumbai Metro 3

profile
BURHANUDDIN FATEHI
Jul 25, 2022
0 Likes
0 Discussions
169 Reads

The Aqua Line 3 of the Mumbai Metro,[5] also known as Colaba-Bandra-Seepz Line, is a part of the metro system under construction in Mumbai, India.[6][7] When completed, the 33.5-km long line will be the first underground metro line in Mumbai and will be operated by MMRC.[8] The metro line will connect Cuffe Parade business district in the extreme south of the city to SEEPZ in the north-central[9] with 26 underground and one at-grade station.[10] The track width is standard gauge. The cost of this corridor is estimated at ₹30,000 crore (US$3.8 billion). Line 3 is expected to reduce road congestion, besides reducing the load on the Western Line between Bandra and Churchgate.[11][12]

The project is being implemented by the Mumbai Metro Rail Corporation Limited (MMRCL). The line starts at Cuffe Parade, will run through Nariman Point, Churchgate, CSMT, Girgaon, Worli, Dadar, Mahim, Bandra-Kurla Complex, Santacruz (East) and past the domestic and international terminals of Mumbai Airport, through Andheri MIDC and terminates at SEEPZ.[11][13] The 33.5 km, Rs. 23,136 crore project involves five major entities - MMRCL (Mumbai Metro Rail Corporation Limited), Padeco, MMRDA, CREC (China),.[14] Major (65%) funding for the project was received through a soft loan of Rs. 13,235 crore from JICA (Japan International Cooperation Agency) with the rest provided by the exchequer through the Government of India and Government of Maharashtra.[15][14][16]

The section of the line between Bandra Kurla Complex and Dharavi stations includes a 170 metre long twin-tunnel passing under the Mithi river. One of the tunnels was completed in March 2020.[17] This will be the second under-river metro rail tunnel in India after the tunnel underneath the Hooghly river on Kolkata Metro Line 2.[18]

The construction of this metro route faced hurdles from environmentalists and activists lodging numerous PILs over cutting of trees in various region accompanied with a larger protest in Aarey over the carshed construction. PILs were either dismissed or didn't succeed as both the Supreme Court and the Maharashtra High Court cited the importance of the metro project.[19][20]

An extension of the line has also been proposed to extend the line by 2.5 km to Navy Nagar from Cuffe Parade. As per the initial plan, Cuffe Parade was planned to be the first station of the line; however, after extension, the first station will be Navy Nagar. There are 26 stations planned earlier, which will be 27 stations on the line after the extension. The extension on metro line 3 will cost an additional ₹2,301 crore.[21][22]


Comments ()


Sign in

Read Next

The 60-Minute Window: What to Do (And What NOT to Do) When You Knock Out a Tooth

Blog banner

TEAMWORK

Blog banner

Review on Cyber Forensics and its Analysis Tools

Blog banner

ARTICAL ON MANAGEMENT SYSTEM

Blog banner

Why You Need 2FA (Two-Factor Authentication) On Your Email And Other Online Accounts

Blog banner

The Impact of Cyber Forensics on Corporate Governance and Compliance

Blog banner

Scheduling in Operating Systems

Blog banner

All you need to know about Cassandra

Blog banner

INTERNET SECURITY

Blog banner

Types of threads

Blog banner

This too shall pass

Blog banner

Deadlock

Blog banner

Beyond the Track: Why the Best Hotel in Arcadia, Florida, Completes Your IMSA Sebring Getaway

Blog banner

Why is it hard to design an Operating Systems ?

Blog banner

Ganpati Special: Exotic 51 Modak flavours by Mahavir Dryfruits

Blog banner

Threads in OS

Blog banner

PROCESS CONTROL BLOCK IN OS

Blog banner

Cache memory

Blog banner

Getting into anime My anime suggestions

Blog banner

Multithreading in Operating System

Blog banner

File Allocation Methods

Blog banner

Facebook marketing

Blog banner

Exploring the Power of Encase Forensic Tools: Unraveling Digital Mysteries

Blog banner

A Journey By Train

Blog banner

Types of Viruses

Blog banner

NETWORK SECURITY RISKS

Blog banner

Personalised Name Labels vs. Handwritten Stickers: Which Is Better for Your Child’s School Essentials?

Blog banner

TRIGGERS IN DATABASE

Blog banner

What is metaverse?

Blog banner

Hello World

Blog banner

Trends that began during the pandemic

Blog banner

Smartsheet

Blog banner

1 Dentist in Maroubra, Sydney and her 10 obsessions

Blog banner

INTRODUCTION

Blog banner

Cloud Security: Trends and Innovations

Blog banner

File system implementation

Blog banner

Process Description

Blog banner

ITIL Version 3 and 4 differenciation?

Blog banner

?What Your Dentist Notices The Moment You Sit In The Chair

Blog banner

Network Security Risks

Blog banner

Making Money through Instagram

Blog banner

How to Manage Business Invoices and Payments Easily?

Blog banner