The Aqua Line 3 of the Mumbai Metro,[5] also known as Colaba-Bandra-Seepz Line, is a part of the metro system under construction in Mumbai, India.[6][7] When completed, the 33.5-km long line will be the first underground metro line in Mumbai and will be operated by MMRC.[8] The metro line will connect Cuffe Parade business district in the extreme south of the city to SEEPZ in the north-central[9] with 26 underground and one at-grade station.[10] The track width is standard gauge. The cost of this corridor is estimated at ₹30,000 crore (US$3.8 billion). Line 3 is expected to reduce road congestion, besides reducing the load on the Western Line between Bandra and Churchgate.[11][12]

The project is being implemented by the Mumbai Metro Rail Corporation Limited (MMRCL). The line starts at Cuffe Parade, will run through Nariman Point, Churchgate, CSMT, Girgaon, Worli, Dadar, Mahim, Bandra-Kurla Complex, Santacruz (East) and past the domestic and international terminals of Mumbai Airport, through Andheri MIDC and terminates at SEEPZ.[11][13] The 33.5 km, Rs. 23,136 crore project involves five major entities - MMRCL (Mumbai Metro Rail Corporation Limited), Padeco, MMRDA, CREC (China),.[14] Major (65%) funding for the project was received through a soft loan of Rs. 13,235 crore from JICA (Japan International Cooperation Agency) with the rest provided by the exchequer through the Government of India and Government of Maharashtra.[15][14][16]

The section of the line between Bandra Kurla Complex and Dharavi stations includes a 170 metre long twin-tunnel passing under the Mithi river. One of the tunnels was completed in March 2020.[17] This will be the second under-river metro rail tunnel in India after the tunnel underneath the Hooghly river on Kolkata Metro Line 2.[18]

The construction of this metro route faced hurdles from environmentalists and activists lodging numerous PILs over cutting of trees in various region accompanied with a larger protest in Aarey over the carshed construction. PILs were either dismissed or didn't succeed as both the Supreme Court and the Maharashtra High Court cited the importance of the metro project.[19][20]

An extension of the line has also been proposed to extend the line by 2.5 km to Navy Nagar from Cuffe Parade. As per the initial plan, Cuffe Parade was planned to be the first station of the line; however, after extension, the first station will be Navy Nagar. There are 26 stations planned earlier, which will be 27 stations on the line after the extension. The extension on metro line 3 will cost an additional ₹2,301 crore.[21][22]


Comments ()


Sign in

Read Next

LinkedIn

Blog banner

MULTITHREADING:ENHANCEING PERFORMANCE AND EFFICIENCY IN COMPUTING

Blog banner

Capacity management in ITSM

Blog banner

Service Operation

Blog banner

Types of Hackers

Blog banner

NETWORK SECURITY RISKS

Blog banner

Sage

Blog banner

Rules and Regulations of Networking: "Standards and Protocols" - Part 2

Blog banner

Types of Threads

Blog banner

Social Media Marketing Trends 2022

Blog banner

How To Setup DVWA Using XAMPP on Windows

Blog banner

Data Warehousing

Blog banner

Big O Notation

Blog banner

What is Password Cracking ? and it's Techniques.

Blog banner

Brain wash of social media

Blog banner

RAID

Blog banner

Memory Management of Operating System(OS)

Blog banner

Clarizen

Blog banner

memory cache

Blog banner

Real-Time Operating Systems (RTOS) Deep Explanation

Blog banner

Indian Culture and Tradition

Blog banner

Fault Tolerance

Blog banner

(Input/Output) in os

Blog banner

A Traveller’s Guide to Offbeat Places in Arcadia, Florida

Blog banner

Virtual Machine

Blog banner

Python as a tool for Data science task & project

Blog banner

CYBER FORENCIS: PAST, PRESENT AND FUTURE.

Blog banner

Real time scheduling

Blog banner

MOVEMBER

Blog banner

Race condition

Blog banner

Multithreading in Operating System

Blog banner

What is HTML?

Blog banner

Big Data

Blog banner

Data Analytics in Data Science

Blog banner

Segmentation and paging concept

Blog banner

Volatile Memory & Non-Volatile Memory Explained

Blog banner

Deadlock in operating system

Blog banner

Penetration Testing

Blog banner

Direct Memory Access

Blog banner

A-B-C of Networking: Part-2 (Components)

Blog banner

NIKE

Blog banner

ROLE OF THE COMPUTER FORENSICS TOOLS AND TECHNIQUES

Blog banner